Power, light, and the quiet networks a building depends on. Drawn, built, and kept by the same team.

We shape electrical systems for hospitals, banks, universities, and plants, where a failure is not an option and the work is meant to last.

The work

Design

Build

Maintain

Inspect

More than forty years of continuous work, in Costa Rica and Latin America.

Sectors

Residential

Houses, apartments, towers, and condominiums.

Commercial

Shops, supermarkets, malls, restaurants, offices, banks, and hotels.

Industrial

Factories, processing plants, warehouses, power plants, data centers, and distribution centers.

Institutional

Government buildings, hospitals, museums, schools, and universities.

Systems

Power

Lighting

Voice and data

Fiber

CCTV

Access

Alarms

Detection

BMS

Transformers

Emergency plants

Projects

1994 · CCSS

Electromechanical design of the new Hospital de Alajuela. 40,000 m².

2001 · Intel

Plant CR-3. Electrical work and machine connections, with Fisk Electric. 3,000 m².

2001 · Sawtek

Electrical expansion of the industrial plant, Zona Franca Metropolitana. 5,000 m².

2003 · Vicesa

Planta Cerámica Florentina. Design and construction of the electrical work. 8,000 m².

2005 · Recope

Refinería de Limón. Power, control, and instrumentation cabling for boiler U-505. 10,000 m².

2007–2009 · Allergan

Emergency plant, 650 kW. Zona Franca Global Park.

2009 · ICE

Biblioteca Nacional. Electrical redesign, voice and data, CCTV, and access. 16,000 m².

2011 · Grupo Orosi

Design and construction of the medium and low voltage distribution. 15,000 m².

2013 · UCR

Vicerrectoría de Investigación and SEP. Electrical work and telecommunications. 15,000 m².

2013 · Meza Cordero

Centro Comercial San Rafael de Alajuela. Design and inspection of the electrical work and telecommunications. 40,000 m².

2014 · Hotel Caña Brava

Design advice for a 136 kW photovoltaic system. Guanacaste.

2018–2021 · Banco Central

Museo del Oro and Edificio Moravia. Preventive and corrective maintenance of the electrical system. 50,000 m².

2021 · Hospital Metropolitano

Survey and diagnosis of the electrical system. 8,000 m².

2022–2024 · Kinder Bellelli

Electrical system, detection, security, and data network. Santa Ana.

2026 · Cementos Progreso

Electrical circuits and distribution board for the fuel system. Abangares.

Connect