Water, air, and the gases a building moves without asking to be noticed. Calculated and built alongside the electrical work.

Mechanical work stays with the electrical: hydraulic networks, climate, pumps, and medical gases, carried by one team from the drawing to the years after.

The work

Design

Build

Maintain

Inspect

More than forty years of continuous work, in Costa Rica and Latin America.

Sectors

Residential

Houses, apartments, towers, and condominiums.

Commercial

Shops, supermarkets, malls, restaurants, offices, banks, and hotels.

Industrial

Factories, processing plants, warehouses, power plants, data centers, and distribution centers.

Institutional

Government buildings, hospitals, museums, schools, and universities.

Systems

Potable water

Grey water

Black water

Stormwater

Treatment

Mechanical rooms

Pumps

Fire pumps

LPG

Steam

Medical gases

Climate

Projects

1994 · CCSS

Electromechanical design of the new Hospital de Alajuela. 40,000 m².

2007–2009 · Allergan

Compressed air equipment, 100 HP. Zona Franca Global Park.

2018 · San Juan de Dios

Centro de Equipos. Mechanical work, with the electrical, fire, and data systems. 500 m².

2018 · Edificio EBY

Electromechanical work at La Uruca. 4,000 m².

2018–2019 · San Juan de Dios

Mechanical and electrical work in Cytology and stress testing. 3,250 m².

2020 · Hotel Irazú

Elevator modernization, Edificio Norte. 2,000 m².

2025 · Zona Franca Coyol

Various mechanical systems.

Connect